LGED News   |   LGED has launched upgraded version of the website and now it is running on trial basis   |   Please give your feedback   |   LGED News

Procurements of LGED

Works

Division wise

1. Executive Engineer's Office in Dhaka Division
2. Executive Engineer's Office in Chittagong  Division
3. Executive Engineer's Office in Rajshahi Division
4. Executive Engineer's Office in Khulna  Division
5. Executive Engineer's Office in Barisal Division
6. Executive Engineer's Office in Sylhet  Division

Head Quarters

SL Project Name Description Last Date Details
1 Secondary Towns Integrated Flood Protection Project Phase-2. Tender Notice Number : 07/2010-11

District: Manikganj
Tender Package No.: DW-11

Construction of
a) RCC drain cum RCC road from Women’s College Hostel to DW-04. (Ch.0+00-0+320m) with a link (Ch.0+00-0+083m);

b) RCC drain from H/O Mohashin to H/O Abdul Khaleque at Bandutia (Ch.0+00-0+215m) with link (Ch.0+00-0+035m);

c) RCC drain from Dhaka-Aricha road to United General Hospital (Ch.0+00-0+102m) with a link (Ch.0+00-0+023m); (Total Length 778m) Manikganj Pourashava, Manikganj.
2010-09-21 Details
2 Construction of Large Bridge on Upazila & Union Road (Formal Construction of Portable Steel Bailey Bridges under Netherlands Assistance ORET Programme.) IFPQ NO: 01/2010
District: Chapai Nawabgong
Pre-Qualification of Tenderers for Construction of 546.600m long PC Girder Bridge over Mohananda river on Namosankorbati G.C. – Dhulauri G.C via Saheber Ghat under Chapai Nawabgong Sadar Upazila of Chapai Nawabgong District
2010-09-06 Details
3 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : 03/2010-2011

District: Brahmanbaria
Name of Works:
Construction of RCC drain from badhagor Rail gate to Titas river (ch. 0+00-1+040m), Brahmanbaria Pourashava, Brahmanbaria.

Construction of RCC Drain start from

a) Alok Sanitary to Titas River (Ch.0+00-0+330m);

b) Station road to Eid ghah field via X Commissioner Nasim’s house (Ch.0+00-0+246m);

c) Dak Bangla moar to Railway Borrow pit via Morail Graveyard (Ch.0+00-0+350m);

d) Station moar to kalibari moar via Habib Miah’s Hotel (Ch.0+00-0+391m);

e) T.A road to Principal Bangla (Ch.0+00-0+270m);

f) Poniout Bypass to Railway Borrow pit (Ch.0+00-0+668m); B. Baria Pourashava, B. Baria. 

Construction of RCC Drain start from

a) Madhapara H/O Ripon to Town Khal (Ch.0+00-0+414m);

b) Madhapara to RHD Borrow pit (Ch.0+00-0+225m);

c) Railing of Town Khal (Remaining Part of DW-07) (North side Ch.0+00-0+480m & South side Ch.0+067-0+480m); B. Baria Pourashava, B. Baria.

2010-09-05 Details
4 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : (STIFPP-II) 13/2010-2011

District: Gaibandha

Construction of  RCC drain from:

a) Polashpara Jame Mosque to DB road BRTC Counter b) College road to DB road via Polashpara more c) H/O Alimuddine to Nurul Islam house at  DB road d) Shadullahpur toad to DB road BRTC Counter Gaibandha Pourashava, Gaibandha..

Construction of  RCC drain from:

a) Advocate Nurul Islam house to Palashbari DB road b) Omer Kaji house to LGED office mour c) Al-Hira Mosque to V-Aid Road Kali Bari More d) Munsipara Shahid Minar More to Mayor House e) Noni Shah More to Balai Shah More at f) Eye Hospital to Anticorruption office g) Drain cover slab at different Location, L=2550m.(Total Length 4685m) Gaibandha Pourashava, Gaibandha.

2010-09-22 Details
5 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : 22/10-11 (ST)

District: Mymensingh
a)        Cons. of RCC drain from jailkhana khal starting  to  rail Line side DW -19 outfall drain (Ch.0+000 to 0+535m);

b)        Cons. of RCC drain from Tinkona pukur par to rail line DW-19 outfall drain (Ch.0+000 to 0+710m);

c)        Cons. of RCC drain from Police Line Petrol Pump to Tinkona pukur par (Ch.0+000+323m);

d)        Cons. of RCC drain starting from jamtala mour to Shankipara Shesh mour through Coronation mour (Ch.0+000 0+298m);

e)        Cons. of RCC drain starting from Abbasuddin Mondol,s house to Maskanda Bus stand via Nayapara (Ch.0+000 0+665m);

f)          Cons. of RCC drain starting from Balaspur Alia Madrasha mour to river via by pass with a link drain(Ch.0+000 0+675m & ch.0+000 to 0+290m); and

g)        Construction of RCC Railing i) Along Shehera Khal at different chainages from Ch.0+000 to 2+284m(total length=630.00m)

         ii) Along Gohail  Kandi Khal  at different chainages from Ch.0+000 to0+820m (total Length=290.00m)

 iii)Along Makerjanj Khal at different chainages from Ch.0+000 to 2+210m (total Length=495.00m).(Total Length 4911 m); Mymensingh Pourashava, Mymensingh. 
2010-09-06 Details
6 Secondary Towns Integrated Flood Protection Project Phase-2. Tender Notice Number : 07/2010-11 District: Manikganj Tender Package No.: DW-11 Construction of a) RCC drain cum RCC road from Women’s College Hostel to DW-04. (Ch.0+00-0+320m) with a link (Ch.0+00-0+083m); b) RCC drain from H/O Mohashin to H/O Abdul Khaleque at Bandutia (Ch.0+00-0+215m) with link (Ch.0+00-0+035m); c) RCC drain from Dhaka-Aricha road to United General Hospital (Ch.0+00-0+102m) with a link (Ch.0+00-0+023m); (Total Length 778m) Manikganj Pourashava, Manikganj. 2010-09-21 Details
7 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : (STIFPP-II) 13/2010-2011 Corrigendum

District: Gaibandha
Construction of  RCC drain
Package No. DW-15 & DW-16
2010-09-08 Details
8 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : J.P./STIFPP-2/DW-15

District: Jamalpur
Construction of  RCC drain
Package No. DW-26 &  DW-27

2010-09-20 Details
9 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : 03/2010-2011

District: Kushtia
Construction of  RCC drain

Package No
. DW-20 DW-21 DW-22 & DW-23

2010-09-05 Details
10 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : 02/2010-2011

District: Munshiganj

Construction of RCC drain
Package No. DW-15 DW-16 & DW-17
2010-09-22 Details
11 Secondary Towns Integrated Flood Protection Project Phase-2. Tender Notice Number : 01/2010-2011
Rajshahi City Corporation, Rajshahi

Construction of :                                 

a) RCC Primary Drain of Remaining part of Darusha drain                         

b) RCC Drain of Remaining Portion of Keshob pur drain

C) RCC Drain of Remaining Portion of Circuit house Primary drain at Cylinda

d) RCC drain start from Binodpur Bazar to Satbaria Primary Drain via Science Lab

e) RCC drain start from University Society (Bihash) to Satbaria Primary drain, Rajshahi City Corporation, Rajshahi.
2010-09-21 Details
12 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : 07/2010-11

District: Manikganj

Construction of

a) RCC drain cum RCC road from Women’s College Hostel to DW-04. (Ch.0+00-0+320m) with a link (Ch.0+00-0+083m);

b) RCC drain from H/O Mohashin to H/O Abdul Khaleque at Bandutia (Ch.0+00-0+215m) with link (Ch.0+00-0+035m);

c) RCC drain from Dhaka-Aricha road to United General Hospital (Ch.0+00-0+102m) with a link (Ch.0+00-0+023m); (Total Length 778m) Manikganj Pourashava, Manikganj. 
2010-09-21 Details
13 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : 03/STIFPP-2/2010-2011

District: Sunamganj

Construction of RCC Drains start from

a) H/O Abdur Rouf to Hason Mazar Khal (Ch.0+00-0+122m) and link (Ch.0+00-0+055m);

b) Back side of BIAM English Medium School to DW-08 (Ch.0+00-0+210m);

c) Kazi Bari to DW-01 (Ch.0+00-0+401m);

d) Banani para road to DW-01 (Ch.0+00-0+310m);

e) H/O Arun Babu to DW-08 (Ch.0+00-0+070m);

f) Surma River to DW-12 (Ch.0+00-0+130m);

g) Construction of RCC Railing by the side of completed and under construction Primary drain DW-02, DW-06, DW-07 & DW-18, (Total Railing Length = 671m);

h) Arafinnagar Primary School to Kamar Khali Khal via Mitara Cinama Hall (Ch.0+00-0+380m);

i) Jamtola to DW-14 via Jamaipara Market culvert (Ch.0+00-0+213m) with a link (Ch.0+00-0+012m);

j) Alipara Main drain to College culvert (Ch.0+00-0+320m);

k) Hazipara road (DW-19) to RHD Borrow pit via S.P Office (Ch.0+00-0+590m);

l) H/O Istiaque Shamim to South Kacha Khal (Ch.0+00-0+090m);

m) H/O Sajal Miah to Hawar (Ch.0+00-0+138m) ;(Total Length = 3041m) Sunamganj Pourashava, Sunamganj.
2010-09-21 Details
14 Construction of Large Bridge on Upazila & Union Road (Formal Construction of Portable Steel Bailey Bridges under Netherlands Assistance ORET Programme.) IFPQ NO: 01/2010 (Corrigendum)
District: Chapai Nawabgong
Pre-Qualification of Tenderers for Construction of 546.600m long PC Girder Bridge over Mohananda river on Namosankorbati G.C. – Dhulauri G.C via Saheber Ghat under Chapai Nawabgong Sadar Upazila of Chapai Nawabgong District
2010-09-06 Details
15 Secondary Towns Integrated Flood Protection Project Phase-2.

Tender Notice Number : (STIFPP-II) 14/2010-2011 (Amendment)

District: Gaibandha
Construction of RCC drain
Package No. DW-17 and DW-18
2010-09-23 Details


Intro | Home | Contact Us | Feedback | Privacy Policy | Terms of use | LGED Webmail

Copyright © 2009 Local Government Engineering Department. All rights reserved